More details of the release in https://wiki.openmrs.org/x/i4DTAw

Build: #582 was successful Changes by mogoodrich <mgoodrich@pih.org>

Stages & jobs

  1. Default Stage

  2. Release

    Requires a user to start manually

Build result summary

Details

Completed
Queue duration
< 1 second
Duration
5 minutes
Labels
None
Revisions
Git
6d145fae171bfc376b6480d7b2ff6887f7f7194e
Release scripts
a9c6b4741f415820e397e9b150cf80baca7f9368
Total tests
675
Successful since
#581 ()

Tests

Code commits

Git
Author Commit Message Commit date
mogoodrich <mgoodrich@pih.org> mogoodrich <mgoodrich@pih.org> 6d145fae171bfc376b6480d7b2ff6887f7f7194e REPORT-750: Add support for OpenMRS 2.0 platform fixed conditional resource loading

Configuration changes

Some of the jobs or stages referenced by this result no longer exist.

Manual stage Release cannot be run as it references jobs that no longer exist.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeREPORT-750Could not obtain issue details from Jira