Release Plan for stock management
Build: #8 failed Manual run from the stage: Release by Samuel Lubwama
Build result summary
Details
- Completed
- Queue duration
- < 1 second
- Duration
- 19 minutes
- Labels
- None
- Revisions
-
- Git
-
b938d587f8adb87142b1d3177e43dacd19e872ce
b938d587f8adb87142b1d3177e43dacd19e872ce - Release scripts
-
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
- Total tests
- 46
- Fixed in
- #10 (Manual run from the stage: Release by Samuel Lubwama)
Tests
- 0 New failures
- 0 Existing failures
- 0 Fixed
Responsible
No one has taken responsibility for this failure
Error summary for Release to Maven
The job generated some errors, drill down into the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.