Release Plan for stock management
Build: #8 failed
Job: Release to Maven failed
Job result summary
- Completed
- Duration
- 9 minutes
- Agent
- yu.openmrs.org
- Revisions
-
- Git
-
b938d587f8adb87142b1d3177e43dacd19e872ce
b938d587f8adb87142b1d3177e43dacd19e872ce - Release scripts
-
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
- Fixed in
- #10 (Manual run from the stage: Release by Samuel Lubwama)
Error summary
The build generated some errors. See the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.