Release Plan for stock management
Build: #9 failed Manual run from the stage: Release by Samuel Lubwama
Build result summary
Details
- Completed
- Queue duration
- < 1 second
- Duration
- 28 minutes
- Labels
- None
- Revisions
-
- Git
-
f50983dc7a4e8b942481505ab4aac0202b948714
f50983dc7a4e8b942481505ab4aac0202b948714 - Release scripts
-
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
- Total tests
- 46
- Failing since
- #8 (Manual run from the stage: Release by Samuel Lubwama – )
- Fixed in
- #10 (Manual run from the stage: Release by Samuel Lubwama)
Tests
- 0 New failures
- 0 Existing failures
- 0 Fixed
Responsible
This build has been failing since #8
No one has taken responsibility
Code commits
Author | Commit | Commit date | |
---|---|---|---|
Lubwama Samuel <lubwamasamuel3@gmail.com> |
f50983dc7a4e8b942481505ab4aac0202b948714
|
Error summary for Release to Maven
The job generated some errors, drill down into the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.