Release Plan for stock management
Build: #9 failed
Job: Release to Maven failed
Job result summary
- Completed
- Duration
- 8 minutes
- Agent
- yu.openmrs.org
- Revisions
-
- Git
-
f50983dc7a4e8b942481505ab4aac0202b948714
f50983dc7a4e8b942481505ab4aac0202b948714 - Release scripts
-
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
- Failing since
- #8 (Manual run from the stage: Release by Samuel Lubwama – )
- Fixed in
- #10 (Manual run from the stage: Release by Samuel Lubwama)
Error summary
The build generated some errors. See the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.